Skip to content
Timber roof trusses on a new house frame against a blue sky
Borrowing limits

How much can I borrow for a construction loan?

How much you can borrow for a construction loan is set by three numbers: the value or cost of the land plus the build, the lender's loan to value ratio on that figure, and your ability to repay. Banks lend on the lower of cost and valuation, release money in stages, and leave you carrying the gap between draws. Equity in property you already own can fill that gap.

Construction Finance Online · Updated 26 November 2026 · 8 min read

Every builder asks this before the contract is signed, and most get a flat percentage in reply. That tells you nothing. The real limit comes from three numbers, and one of them is usually where the gap hides. Here’s how a lender gets to your figure, a worked example with round numbers, and how to cover the shortfall without stalling the job.

Who usually qualifies for the amount they want?

Lenders reach a bigger number when the picture is clean. You are usually in good shape when most of these are true:

  • Land: you own the block outright or with plenty of equity, or you have a signed contract to buy it.
  • Contract: a fixed price contract with a licensed builder, or a costed owner builder permit, with plans and approvals.
  • Deposit or equity: your own cash, or usable equity in land or property you already own.
  • Income or exit: repayments that pass the bank’s test, or a clear sale or refinance when the build finishes.
  • Paperwork: tax returns, BAS and bank statements that tell the same story.
  • Credit history: no recent defaults you can’t explain.

Short on one or two? The sections below show which route still works.

What are the three numbers that set your limit?

A construction lender sets your limit from the project value, a loan to value ratio (LVR) and your ability to repay. Each one can be the ceiling.

  1. Project value. Banks work from the total cost (land plus the building contract) and a valuer’s ‘as if complete’ figure, and generally lend on the lower of the two. Westpac’s page says a registered valuer values the proposed construction, and that if costs rise a revised valuation may be needed, which can mean extra fees or a lower loan limit.
  2. The LVR. Each lender sets a maximum percentage of that value. It varies by lender, by whether you’re an owner occupier, investor or builder, by location and by contract type. Ask for the current figure in writing.
  3. Serviceability or exit. Banks test your income against repayments. APRA’s macroprudential settings keep the serviceability buffer at 3 percentage points, so your repayments are tested at 3 points above the actual rate.

One piece of 2026 news helps. APRA’s debt to income limit has applied since February 2026, but its information paper says loans for the purchase or construction of new dwellings are exempt. The 3 point buffer still applies.

How does a worked example look?

Example: a small builder in Penrith owns a block worth $600,000 with no debt. She signs a $700,000 contract for a new house, so the total cost is $1.3 million. A valuer says the finished property would be worth $1.4 million. The lender uses the lower figure, $1.3 million.

At a lender maximum of 80% (an assumed round number for this example), the limit is $1.04 million. The gap between that and the $1.3 million cost is $260,000. Her land is worth $600,000 and counts toward the gap, so she needs no cash deposit.

The number is only half the story. The next problem is timing.

Why does the loan not cover your early costs?

Money is released in stages, not as a lump. Westpac describes five stages: slab, frame, lockup, fit out and completion, each triggered by an invoice once that stage is complete. Before it pays, the lender may inspect, so each draw adds days.

Then there’s the front end. Demolition, soil tests, engineering, council fees and the first deposit often come before any draw. If you’re buying the land too, the first release usually goes to the land. The builder (or owner builder) carries the cost between draws.

StageWhat gets paid forWhere the cash gap sits
Before the first drawApprovals, demolition, site works, depositYou carry all of it
SlabFootings, plumbing, concreteWait for inspection and release
Frame and lock upTimber, trusses, roof, windowsSupplier accounts due before the draw lands
Fit outFixing, cabinetry, tiling, paintingTrades want paying weekly
CompletionFinal works, certificatesLast payment depends on a final inspection

Our guide to construction loan progress payments covers the cash flow side in more detail.

Carrying a gap between draws? Check where you stand. It takes about 60 seconds.

Does the finished value of the build count?

For a bank, yes, in part: the ‘as if complete’ valuation is one of the figures used. For our loans, no. Property secured loans here are secured against property you or a guarantor already own, such as your home, an investment property or land with equity. They are never secured against the finished value of the build, an ‘as if complete’ valuation or progress draws.

That difference changes your limit. A bank construction loan is sized by the project. A property secured loan is sized by the equity you already hold, and no financials are needed for it. Bad credit and ATO debts are considered.

How much equity can cover the gap?

Take the value of the property you already own, apply a planning LVR, then subtract what’s owed. What’s left is your usable equity.

Example: a builder in Newcastle owns a home worth $1 million with $500,000 owing. At a planning figure of 70% the lender could secure up to $700,000, so usable equity is about $200,000. That could cover demolition, council fees and the slab on a two unit build while the bank construction loan is arranged.

Real figures depend on the lender and the valuation. Test your own numbers with the construction equity calculator, which shows usable equity and the funding gap on planning LVR bands.

Terms are typically 1 to 12 months, and loans run from $20,000 to $5 million for business and investment purposes. They can fund in as little as 24 hours once the valuation and documents are in. In Victoria a caveat loan can do the same job; everywhere else a second mortgage is used. Our guide to how a second mortgage works has the mechanics.

Not sure whether you have enough equity? See what could work for your build.

What else can lower your limit?

Four things trip people up:

  • A cost blowout. If the contract price rises, the lender may revalue, and the limit can drop (Westpac says so on its page).
  • A low valuation. A valuer who comes in under cost leaves you funding the difference.
  • Costs outside the contract. Connections, landscaping, driveway and fencing are often left out of the building contract but still need paying.
  • Thin paperwork. Self employed builders with lumpy income may be assessed on averages, which our guide on construction loans for self employed builders explains.

Build a 10 to 15 percent contingency into your numbers. If the bank won’t lend on it, your equity can carry it.

What should you gather before you ask a lender for a number?

Walk in with these and the first conversation turns into a real figure rather than a “send us more”:

  • The signed contract (or owner builder costings), plans and the approval or permit
  • The land value, or the purchase contract if you haven’t settled
  • Your latest return, assessment notice and recent BAS
  • Business and personal bank statements for the last few months
  • The address, value and balance owing on any property you’d offer as security
  • Your exit in one line: sell, refinance to a long term loan, or keep

The construction loan documents checklist goes through each item. If a bank has already declined you, read what to do when the bank says no before you reapply, since every extra application can leave a mark.

How do you stop a low number killing the project?

Work backwards from the cheapest cash you can find. Use your own cash first, then equity in property you already hold for the early costs, then the bank facility for the staged build. Ask the bank what its limit is before you sign the contract, not after; a limit that comes in $150,000 short is far easier to fix at quote stage than on slab day. If the numbers still don’t close, a smaller scope, a staged build or a cash flow loan for the trades’ weekly pay can bridge the rest.

Let’s work out your number

You know the build. What you don’t know yet is how much of it a lender will fund and who carries the rest. We can look at the equity you already hold, the stage you need to get across and an exit that makes sense.

Enquiring takes about a minute and there’s no credit check at this stage, so your file stays clean. Your details go to one lending specialist, not a pile of lenders, so the phone stays quiet. A real person who knows how builds are paid will run your numbers and ring you back. Please fill the form in accurately (amount, purpose, property value, what’s owed) so the first option we talk through is one that can fund.

Find out how much your build can borrow →

Ready when you are

Check your options in about 60 seconds

A few quick questions. Asking won't touch your credit file, your details aren't sent to a pile of lenders, and a real person reads every enquiry.

Frequently asked questions

How much can I borrow for a construction loan?

It depends on the land value plus build cost (or the valuer's figure, whichever the lender uses), the lender's maximum loan to value ratio, and whether your income or exit supports the repayments. Maximums differ by lender and borrower, so get the lender's current policy in writing before you sign a building contract.

Does a construction loan lend on the finished value of the house?

Banks usually test both the cost of the project and the valuer's 'as if complete' value, and lend against the lower figure. Our loans work differently: they are secured on property you or a guarantor already own, never on the finished value of the build or on progress draws.

Do I need a deposit for a construction loan?

Usually, yes, but the deposit can be the land itself. If you already own the block with equity, many lenders count it toward your contribution. If you are buying land as well, expect to fund the gap between the loan and the total cost from cash or other property equity.

Why does the bank only release part of the loan at the start?

Construction loans are paid in stages as the build progresses, usually slab, frame, lock up, fit out and completion. Westpac's own page describes five stages, with the lender sometimes inspecting before each payment. The builder carries costs between stages.

Can equity in my home help fund a build?

Yes. A short term loan from $20,000 to $5 million secured on a home, investment property or land you already own can cover a land deposit, demolition, council fees or a slab, then be refinanced or repaid when the build completes. Funding can happen in as little as 24 hours once the valuation and documents are in.

Does the APRA debt to income limit affect construction loans?

APRA's debt to income limit, in effect from February 2026, exempts loans for the purchase or construction of new dwellings. The 3 percentage point serviceability buffer still applies to your repayments test, so income still matters.

Will enquiring affect my credit score?

No. There is no credit check when you first enquire, so you can find out where you stand without a mark on your credit file.

Need money on site fast?

One 60 second form. No credit check when you first enquire, and your details go to one lending specialist, not a pile of lenders.

Let's get started ›
Let's get started ›